Default GrpWise 6.5 & 7

I am planning on upgrading my current system residing on netware 6, GW 6.5 to GW 7 running on windows 2003 server(not my choice...).

My plan is to get a new server, install 2003, edir and then groupWise 7. I want to create a new post office and MTA on the GW 7 box and then move mailboxes over. I do not want to migrate. I want to be able to do this over an extended period of time without any down time. Can I mix GW 6.5 and 7 stuff. I am assuming I will install the postoffice and mta on the 7 box first and then move 1/2 of the mailboxes over. If this is successful, I will be creating another GW 7 box, with it's own POA and MTA and move the remaining mailboxes over to it. I will then remove the GW 6.5 box. I will migrate the Gwia and the Web access over before removing the box.

Does this make sense and will it work. It may not be the best way, but it will keep my system up and the only downtime will be with the mailboxes that are moving.


Feel free to dive in and let me know if there are any flaws or things I have overlooked.

Thnks,
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -6. The time now is 08:48 PM.


© 2007 Novell, Inc. All Rights Reserved.

SEO by vBSEO 3.1.0