Notices


 
 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #4  
Old 16-Oct-2008, 06:29 PM
Junior Member
 
Join Date: Oct 2008
Posts: 3
vanith 0 reputation points
Default Re: "Object Method Failed" with syncing GW 6.5.7 calendar

We had the same problem with our environment, I discovered by amping up the log in the Groupwise PDA connect to level 3, that certain dates were causing this problem.

Upon further research, the dates that were causing the problem were P.M. scheduled appointments that were rolling over to the next day. (i.e. 6 P.M. - 1 A.M.) If you look at Groupwise, this is a syntax error because the day calendar only goes to 11:30 P.M.

Once you correct the time to 11:30 P.M., it fixes the issue.
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -6. The time now is 09:30 AM.


© 2007 Novell, Inc. All Rights Reserved.

Search Engine Friendly URLs by vBSEO 3.3.0 RC2