LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #4  
Old 27-Jan-2008, 06:34 AM
Senior Member
 
Join Date: Dec 2007
Posts: 177
bperrotta 0 reputation points
Default Re: Sbackup logs verified only 4 jobs completed

Originally Posted by bperrotta View Post
Yes I specified them to repeat. What I said was that after 1/24/08 they stopped logging and there were no more errors. up until they stopped logging, they logged as successful for 4 jobs. I also need to check the time on the server to make sure it is not drifting off. If after deleting the logs it doesn't log again I might consider deleting and recreating a daily backup.

Thanks,
Bill
successful meaning completed without errors.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -6. The time now is 08:29 AM.


© 2007 Novell, Inc. All Rights Reserved.

Search Engine Friendly URLs by vBSEO 3.3.0 RC2