NOVELL FORUMS

 
 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 23-May-2008, 03:30 PM
KittyNoLegs
NNTP User
 
Posts: n/a
Default First server migration

How's this for my "plan"?

Rather than upgrade my DS Master box as the first server (since it's
also the CA and runs IDM 3.5 on it), I was thinking of going this route:

1) Upgrade DS Master and the other two R/W replica servers to eDir 8.8
SP2 (they're on NetWare 6.5 SP6, so that would also mean upgrade to SP7
and then do the eDir upgrade)

2) Take one of my other file/print servers that's in that tree and
upgrade it to SP7 and eDir 8.8

3) Then do a migration of THAT server to OES2 Linux and just mount my
existing NSS volumes on the new OES server.

From my reading it didn't seem that I had to upgrade the DS Master box
to OES 2 Linux first.

I'll have like 50 other servers in the tree at eDir 8.7.3.9, so I hope
that will be okay.

Any thoughts?
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -6. The time now is 04:42 AM.


© 2007 Novell, Inc. All Rights Reserved.

SEO by vBSEO 3.1.0