LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #4  
Old 08-Oct-2009, 09:53 AM
Senior Member
 
Join Date: Oct 2007
Posts: 165
iliadmin 0 reputation points
Default Re: Controlling the frequency the DAU runs

I see on my system when I choose "refesh" for upcoming events, I constantly see the DAUs being scheduled throughout the day, and I have not been able to do anything about it. Whether they are running every time, I don't think so, but I can't understand why they keep getting scheduled all day long.

My workstations are set to refresh only once per day and this is usually at startup, no partial refreshes, etc. since it was causing so many problems.

Can you just delete older DAUs that are listed in the bundles listing that are enabled (older versions)?
__________________
Val
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -6. The time now is 08:41 AM.


© 2007 Novell, Inc. All Rights Reserved.

Search Engine Friendly URLs by vBSEO 3.3.0 RC2