Good day

The workload hangs at copying volume data from source to target (1%) when I arbot the workload I got another error :the connection to the controller is broken. the machine id in which the controller is installed is.......... The last known IP address is.....

other workloads are working fine and I am using block based.

Kindly assist me on resolving this error.