Two servers both on 6.0 sp4/sp5 that we want to move to 6.5. Just
need confirmation on a couple questions:

1. One server is the master replica so I'm assuming we should do it
first and the other one second?

2. Could they be done at the same time?

3. I can't find a good TID on whether we use Migration Wizard or not?
It's staying on the same hardware.

4. Is the install done from a workstation connected to the server with
admin rights OR straight off the server and booting to the 6.5 cd?

5. Any pitfalls I should be aware of by going to the latest SP
considering there will be two other servers in the tree still on 6.0sp4?

Thanks in advance,