We currently have 8 Netware 5.1/sp8 servers with DS 7.62 on our Network.
4 of the servers host our GW 6.5.5. We have a new server (dual
proc.w/4GB of RAM) and were thinking of making this server the first 6.5
(w/sp5) server on the tree. Do we need to first do a migration to upgrade
the 5.1 servers from DS 7.62 to edirectory 8.7.3?