We're planning to migrate Novell from a Dell Poweredge 2400 to a
Poweredge 2600. We're currently running NW 5.1 SP8 (w/GW 6.5.6) & will
move to NW6 SP5. The Novell Migration Wizard 8 documentation states that
the destination server should be setup in a premigration configuration.
However the Dell Open Manage CD we use to setup the destination server
does not offer this choice. As such, we've setup the destination server
in a normal configuration. Is this acceptable or is the premigration
configuration an inflexible requirement?