I have a 5 server NW6.5 SP4a tree. I am migrating one of the servers to
new hardware. I have built the new server with SP6 overlay cds. I will
be adding post sp6 patches before the migration. My question is do I
have to upgrade the current production server to sp6 before doing the
migration? Secondly, the current server has a r/w replica of the root
partition. The server with the master replica is a sp4a. Is there any
problems with having a r/w rep at a higher level than the master?
TIA, Rich