I have just setup a new NW6.5 server with SP6 and now I need to migrate
an old server to this new one. I have the new server setup with the same
tree name as the old server. When looking at the migration doc it said
to install the new sever into a temporary tree. Can I change the name of
the new server so I can do this migration? If so how is this done? Can
I just put the new server into a temporary tree?