I have a need to temporarily bring down my master replica server for a
hardware upgrade. I would feel a lot more comfortable if I could make
another server the master replica holder temporarily. What is the process
for doing this, for the life of me I cannot remember how, although I know
I have done this before, and it was fairly easy. Once the hardware is
upgraded, I will move them back. I just dont want to get in a situation
where netware takes a dump during the upgrade and my tree gets hosed.