We are trying to do a disaster recovery test, as part of this we built our
master server a 6.5 sp6 server, then we tried to build in one of our other
servers a 5.1 sp8, the nds installation never finishes, can a 5.1 be built
into a 6.5 tree, or do I need to build the 5.1 first then add the 6.5 and
move the master?