In Arcserve 11.1 sp2 you're supposed to be able to create a file system device (FSD), a hard disk based back up space and use that as a staging area that will then send the backup job over to tape.

I can create the FSD, but when I go into the group configuration to try and make it a staging group the option is greyed out.

Has anyone else had this problem?

Jim Hamelic
Network Engineer
Wadsworth City Schools