I want to start off builing a new SBS 6.6 two node cluster with the Dual
Compaq DL380 G3 Cluster with an MSA500 storage device. We would put 4 GB
of memory, a pair of 72GB, 10K, mirrored drives for the NW OS in each
server, and 6 72GB, 15K drives in the MSA500 storage case. Would this
hardware scenario work where one server would be an ISCSI initiator and the
other an ISCSI Target? I also have two other server that would be in a
rack that will eventually become nodes 3 and 4 that will access the shared
ISCSI Target drive storage as Initiators. Thanks for the help.