We are going to migrate our NW6.5 SP3 (2 node cluster) from an VA7100
SAN environment to an EVA3000 environment.

Anybody done this or similar job. Are there any pitfalls or other things
to consider.

By the way do I need HP's secure-path for Netware to use Failover with
two HBA's in each cluster node.

Which failover is preferred: HAM failover or MPIO failover.


Joop van Buuren
Senior System Administrator