Hey There kids...

I've got a 2 Node NW6.5 cluster running NCS 1.7

I am wanting to put in another 2 Node cluster and migrate some of the
resources over onto this new cluster. The new cluster will be connected into
the same SAN and hence will already physically be connected to the storage
where the partitions, pools and volumes reside.

Now as far as I have been told, this should be possible by deleting and
recreating the Edir objects which point to the volumes, pools and virtual

Does anyone have any idea of the exact procedure required? What I do not
want to do in any way shape or form is actually physically have to move data
as there's a hell of a lot of it.

All help and advice very appreciated,