I have 7 Netware 6.5sp5 servers I plan to upgrade to Netware 6.5sp6 via the overlay CD's.
I have One Server that has the Master Replica already upgraded to 6.5sp6.
Is there any problem having Multiple servers doing the upgrade at one time?
What is a safe quatity I can upgrade at the same time? Can I do all seven?
The 1st one took almost 2 hrs counting installing the PostSP6 patches.
I want to minimize the Downtime as much as possible.