Hi, I'm planning on replacing my NW51 server with a clean NW65 NOS which
has ZenWorks 3 and 4 in it's environment. Should I perform an upgrade to
ZenWork 7 after I perform my NOS NW65 upgrade or should I upgrade the
ZenWorks prior to my NOS upgrade? Also, should I blow away the 3 and 4
zenworks (and it's objects) and start with a fresh new Zenwork 7? Is there
a way to do this and still be able to use my existing objects? How to best
perform this task? This is my main server with the ZenWork database (Zen4
suite). Soon after, I'll be upgrading my remote sites.