I have an installation of ZENworks 4.01 running on NW6SP5, and would
like to migrate to ZENworks 6.5 on a Windows 2003 server that is a new
member of our eDirectory tree.

My question is, do I have to first migrate the 4.01 components to the
Windows server, then upgrade to 6.5, or can I somehow remove the 4.01
components via C1 and do a fresh install of 6.5 on the W2k3 server,
extending the schema as I do so? (And if this is possible, which
components do I need to remove?)

I don't care to keep any inventory information, but do intend to use the
entire feature set of the new install.

Thanks much,
-Marc Holland