I'm putting in new hardware to run our BM environment (BM35) and I was
going
to simply use the mig wizard but the config on the old box is all over
the
place so I thought I would simply build a new server (NW6SP3) and
reinstall
and reconfigure BM, which I know I would have had to do in any case.

I'd just like to know if there is anything special I need to do when I
take
the old server out of the tree before implementing the new one (it
will have
the same name/address etc). Do I just follow standard procedure for
removing
a server or is there something more I need to do to remove the BM
objects.
The server is also the Master in a 2 node VPN, I realise I will have
to
regenerate the key but I'm assuming it won't matter that I'm
generating it
from a completely new box..?

Thanks

Dean