I have a nw 5.1 server running sp6 with bm .37 installed. I need to
replace the hardware and at the same time upgrade the server to nw 6.5
and bm 3.8. I was thinking that I would go ahead and upgrade the nw5.1
server to bm 3.8. The use the migration wizzard to move the server to
the new hardware running nw 6.5. Once that is done just reinstall bm 3.8
on the server. Will this work or does someone else have a better idea?
Thanks
Grant