I'm setting up a new OES 2 SP1 server into a test tree so I can test Arcserve on new server and tape hardware (Woo-hoo!). When I'm done testing, is there a way I can move the new server from my test tree to the production tree? I've removed servers from a tree before, so I have docs for that. I just haven't found yet how I would install it into the prod tree without going through a brand new install. Thanks for any tips you can point me to.

By the way, if someone thinks I should post to the edir forum instead, let me know. Thanks.