I've done this several times in the past, but the last one was a few years ago and I forget things now a days.

I have an old server running nw 6.5sp5 and BM 3.8sp5, migrating to new server hardware. I've set up the new server as a NW 6.5sp8 migration target with nothing else installed and already migrated data.

I'm going to complete the migration and then install BM 3.9sp1 overlay on the new server, and then sp2 and the IKE patch.

Then go through the BM config and verify all the settings. Any steps I'm missing here? Anything else I'll need to do before or after?

Thanks much for any info.