I have a test lab setup with one DSfW server in a separate, single-server
tree. I would like to migrate to new server (actually from physical server
to guest running on Xenserver 5.5, but since Xenserver doesn't support P2V
for SLES I'll have to do it the old fashioned way).

My current idea is:

1. install the new (virtual) server into the tree as additional DSfW server
for the forest root domain;
2. remove the old server from the tree.

Step 1 is quite well described in the documentation, but I'm not 100% sure
about step 2. Is it the same as removing "any" eDirectory server from the
tree, or are there additional steps I'll have to do regarding DSfW?