I am getting ready for an upgrade from GW 7.0.3 to GW 8 on a NetWare 6.5 sp5 Server. I have a Server that is servicing the Primary Domain and a Post Office, and also 3 Secondary Domains and each having a Post Offices.

I think that I can bring all the agents down and upgrade the entire Server to GW8 and then bring things up one at a time. After the upgrade, bring up the Primary Domain, then it's owning Post Office, then bring up all 3 Secondary Domains, then their Post Offices.

Will this work?