Am moving GW 8.0.1 to Linux SLES 10 sp3 and I ran into a few problems getting some services running in time so I moved things back to the NetWare box temporarily (which was easy to do). Question I have is: since I already ran dbcopy -m -p -s for the second migration run to get the PO data on the Linux system can I just run the same command again (with the -i date option) once I am ready to move and update the PO data on Linux? Or, do I have to start over from scratch with the -f run and the final run with -s? thanks.