Hi all,

Does anybody have an best practice how to move a clustered shadow pool to a new storage device? E.g move the secondary pool from one iscsi target to a other.
2 node SLES10 sp4 + OES2 sp3 cluster
DST setup
primary storage pool 150 GB pool on fc SAN
secondary storage pool 400 GB pool reside on Iscsi

object: To move the secondary storage to a new iscsi server with out losing any files or have all files moving back to primary storage, there is not enough space on primary storage to have all files there anyway.

Has somebody done this successfully?

Best regards

Lennart Johansson