We ran a PoC of Zenworks prior to the rollout to get familiar with the software and are now going into production. I'd like to avoid uninstalling and reinstalling the ZAA on the test workstations if possible, just move them into the new zone. I would think this is a pretty straightforward operation, but for the life of me I can't find this in any of the documentation or google searches I've tried.

We're using Zenworks 11.1a on SLES10, the workstations are Windows 7. I just want to change the zone the workstations are in from the PoC server to the production server. Can I do that without uninstall/reinstall on the WS?