Hi there,

I want to know if it possible, instead of upgrading an exising ZCM 10.3.1 server to ZCM 11, can I install a new ZCM 11 server into the existing Zone as the new Primary.
We need to do OS updates and going from SLES 10 SP3 to SLES 11 would required a OS re-installation. We would then need to re-install ZCM 11 on top of this.

So can I build SLES servers, Install ZCM 11 on them and put them directly into the existing ZCM 10.3.1 zone. OR would I need to first upgrade at least the existing ZCM 10.3.1 Primary server
first to ZCM 11 and then add the new ZCM 11 boxes to the Zone afterwards, pointing to that original 1st Primary installation.
Could I then promote one of the newer ZCM 11 servers to the main primary and drop off the old ZCM 10.3.1 one. We have a external SQL database.