With migration gw 8.0.2 from nw 6.5.8 to sles11 sp1 oes2 I've got problem.
On my nw server there is one domain and the PO. In the DMZ there is a second sles10 server with a domain, gwia and webaccess.
For migration I use gwsvrmig tool.
In step one I move domain to linux. The mitgration process works well here.
In C1 I made the changes in the domain, the mta agent and the link configuration.
The link configguration connects the domain direct via TCP/IP.

When I start the domain on linux, there comes an error that the poa path was not configured.
What modifications do I forget here?
The plan is to migrate the domain first, using the PO on the nw-machine.
In step two I migrate the PO to linux and change the config then.

Thanks in advance for your answers.

Best regards

Dirk Emmermacher