Hi, possibly anyone has seen this and knows how to fix.

A SAP-UM driver is processing around 5.000 changes per day. About 10% of the processed IDOCs stay in state ".proc", where the remaining correctly are renamed into ".done" or ".warn" or ".fail".
Each user update comes in as a separate IDOC containing "System:User:TimeFrom-TimeTo:CLONE". There are no future timestamps in "TimeFrom", so no ".futr" files will be needed and those do not appear.

The ".proc" files have been processed with status "success".
If I remove ".proc" from the file and let it process again... the result is a rename into ".done".

Maybe someone had this issue too and can give me a hint, keeping me away from inspecting a Level-3+ trace for my 5.000 events

Thanks
Rudi